The developer says your flat is ready. You plan the final payment and moving date. At the viewing, a tap leaks, a bedroom window will not lock, and the lift stops downstairs. The representative promises repairs after key collection. You need to know exactly what you are accepting and when it will be fixed. A DHA Islamabad apartment handover needs time for the unit, shared facilities and paperwork. Bring your agreement and leave with a dated defect record. Key collection does not answer every question about building approval or daily operation.
Confirm What the Handover Covers
Before visiting, confirm the unit, floor, area, parking and date when charges begin. Review the sale agreement and specifications. Which fittings and finishes are included? How does the agreement handle defects? Use your own contract; another buyer may have a different package. Ask who can acknowledge your defect list. Inspect in daylight and test lights when power is available. Bring a phone charger, torch, measuring tape and your agreement. Arrange an independent inspector for significant concerns. Match unit and parking identifiers to the agreement. Walk the layout, balcony and storage. Record substituted or missing items and obtain the developer's written response.
Inspect Each Room With Water and Power On
Test the main door, keys, windows, balcony door and cupboards. Look for cracked tiles, loose fittings, damaged paint, stains and frame gaps. Take a room photograph before each defect close-up so its location remains clear. Run taps and showers, including hot water if available. Check under basins, flush toilets and observe accessible drains. Record services that cannot be tested. Bring a plumber for concerns needing diagnosis.
Test Circuits, Sockets and Equipment
Switch on lights, fans and supplied appliances. Check accessible sockets with a plug-in device. Leave panels and technical faults to an electrician. Test agreed intercom and air-conditioning provisions. Photograph the unit meter number and opening reading. If backup power is promised, ask precisely what it supplies. A generator may run the lifts and common lights without powering every flat. Verify the arrangement and its billing method with building management. Do not mark an untested system as working merely because it appears on a brochure.
Walk the Common Areas Before You Accept the Keys
Test the lift and ask who maintains it. Walk the stairs and exit route. Inspect lobby lighting and accessible fire-safety equipment. Ask management how it tests and maintains shared systems. Visible equipment alone does not prove it works. Find your numbered parking bay and follow the route to it. Check its documentary allocation, access cards and charges. Ask how rubbish collection, water storage and cleaning will operate. A finished flat in an unfinished building may remain difficult to use.
Separate Developer Handover From Building Approval
The developer can invite you to collect keys under your contract. The relevant authority has its own building-control process. DHA Islamabad-Rawalpindi publishes building regulations that address plans, inspections and completion. Ask the developer for the building's applicable approval and completion documents, then confirm their current status with DHA Building Control for the exact project. Where another authority or special project arrangement applies, ask which body issues the relevant approval. Do not infer the answer from an occupied neighbouring block. Ask for a written response if the completion process is still under way. What remains to be inspected or submitted, who is responsible and when does the developer expect the next step? Have your property lawyer review the documents and the handover terms if the status affects payment or occupation. Avoid treating a marketing phrase such as “possession ready” as the name of an official certificate.
Keep Unit Ownership and Service Papers Together
Collect the signed handover note, payment receipts, available title or transfer documents, approved specifications and warranties for installed equipment. Ask who holds original building documents and how an owner can obtain verified copies or status confirmation. Request meter identifiers, account-opening instructions, emergency contacts and building-management rules. DHA Islamabad-Rawalpindi's downloads page lists various property and service forms, but your developer must identify the documents that apply to this flat.